top of page


Plastering and troweling
Damaged concrete floor repair
Dry construction decorative tiling and repair
Muddy and water slope tread surface treatment
Flower bed, low wall, water stop pier construction
Cement board construction
Grass brick paving

混凝土柵欄

戶外水池

園藝協助

混凝土柵欄
1/8
Service Description
1. The construction schedule needs to be arranged. The master cannot be available at any time.
2. Construction time is mainly on Saturdays, Sundays and winter and summer vacations.
3. Evening work assignments will increase the allowance for the workers
4. Air conditioning and gas are special industries. We do not handle them.
5. On-site inspection is required. Additional travel expenses will be charged
6. To ensure construction quality, all consumables are purchased by Youpu
bottom of page